
The window
Of course, it didn't stop there.
[1] The car shed was re-roofed. The old concrete roof was torn down because it was collecting rain water and was starting to droop. Somebody commented to my father that the roof might collapse, which basically freaked him out. In place of the concrete we now have metal sheets on a wooden frame, concealed at the bottom by a plaster ceiling. Inside the house, [2] the living and dining areas also receive new plaster ceilings, at my mother’s request, and my father had all of us contribute to [3] install a 3-hp air conditioner in the living area.
Those were only PHASE ONE. Oh, my parents also spent one week painting the kitchen while were out working during the day in PHASE ONE-AND-A-HALF.

The hand
For PHASE THREE, which would most probably come after the wedding, my father is talking about having the retaining walls around the property reinforced and replacing the perimeter fencing.
In the meantime, I am seriously thinking about buying a power drill.
No comments:
Post a Comment